Skip to product information
1 of 6

Vesgantti 141.7" Oversized Boneless Sectional Couch, Modern 7 Seater Modular Sofa with Chaise, Deep Seat Convertible Corduroy Cloud Couches for Living Room, No Assembly Required, Black

Vesgantti 141.7" Oversized Boneless Sectional Couch, Modern 7 Seater Modular Sofa with Chaise, Deep Seat Convertible Corduroy Cloud Couches for Living Room, No Assembly Required, Black

Regular price $2,375.99 USD
Regular price Sale price $2,375.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Deep Seat Sectional Sofa: The Vesgantti 141.7 inch modular sectional is designed with 31.5 inch wide and 29.5 inch deep seats that provide ample generous seating space for stretching out and relaxing. This 7 seater sofa with a chaise,easily accommodates 7-8 peoples, meeting the expansive layout need for large family, making it an ideal sofa for open living spaces and social gatherings
  • Stable Comfort & Lasting Support: Each seat of the Vesgantti sofa is crafted from a whole block of high-resilience foam, delivering uniform support and long-term durability. The full foam structure resists sagging and quickly regains its shape after every use, ensuring lasting comfort for daily lounging. It provides a warm and comfortable space for both relaxation and family activities, perfect for living rooms, apartments, offices, guest rooms, or play areas
  • Ultra-Soft Corduroy Touch: Crafted from high-quality corduroy fabric, this modular sectional offers a perfect blend of softness and durability for everyday comfort. The textured material is gentle on the skin, resistant to pilling, and easy to care—ideal for homes with children and pets. Its simple solid-color design adds warm refinement to your space, and multiple color is for options to match various decor styles. (Note: Actual color may vary due to lighting or monitor settings.)
  • Modular Design, Zero Assembly: The modular sectional sofa lets you effortlessly create the perfect layout for your home. The flexible modular combination adapts to both compact and spacious living rooms, offering endless configuration possibilities to match your lifestyle. No tools or assembly are required. Each module is vacuum-packed—simply unpack, gently pat the sections, and allow 72 hours for full expansion
  • Reliable After-Sales Support: The modular sectional sofa is shipped in 4 boxes, and they may arrive on different days. If you have any questions about delivery, product details, or need assistance during setup or use, our dedicated local customer service team is always here to help. Simply reach out, and we’ll get back to you as soon as possible to provide the support you need

Overview

  • Brand : Vesgantti
  • Assembly Required : No
  • Weight Limit : 3850 Pounds
  • Product Dimensions : 112.2"D x 141.7"W x 35"H
  • Item Weight : 71 Pounds
  • Type : Sectional
  • Color : Black-pinstripe Corduroy
  • Special Feature : Breathable, Curved Arm, Movable Chaise, No Assembly Required, Non Slip
  • Upholstery Fabric Type : Corduroy
  • Room Type : Bedroom, Home Office, Home Theater, Living Room, Playroom
  • Seating Capacity 7.00 : Style Modern
  • : Seating Capacity 7.00
  • : Style Modern
  • Shape Rectangular : Frame Material Foam
  • : Shape Rectangular
  • : Frame Material Foam
View full details