Skip to product information
1 of 8

Vesgantti 143" U Shaped Sectional Modular Couch, Comfy Corduroy Upholstered Modular Cloud Sofas for Living Room, Modern Sectional Sofa with 2 Ottoman Deep Seat, Dark Grey

Vesgantti 143" U Shaped Sectional Modular Couch, Comfy Corduroy Upholstered Modular Cloud Sofas for Living Room, Modern Sectional Sofa with 2 Ottoman Deep Seat, Dark Grey

Regular price $1,578.95 USD
Regular price Sale price $1,578.95 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Spacious and Comfortable Seating: Our 143 inch oversized U-shaped sofa features 23.6 inch deep seating area and 24 inch ottoman, creating a ample leisure space for you and your family. This cloud sofa is designed with double-layered high-resilience foam seat cushions, thick back cushions, and 2 armrests pillows, providing ergonomic support for your waist and back. The extremely soft seat cushions make you feel like you're in the clouds, making the sofa an ideal choice for relaxation
  • Premium Corduroy Fabric: The cloud sofa is upholstered in wrinkle-resistant & soft corduroy fabric, which feels silky soft to touch. The impressive durability and stain-fighting prowess of corduroy fabric keep your modular sofas looking fresh and lively, perfet for homes with children or pets. We have multiple colors for option to match different decoration styles for fully meeting your personalized needs. Tips: There may be slight color difference due to light or display reasons
  • Convertible Modular Sectional Sofa: This cloud sofa features a movable ottoman for flexible switching that you create an left facing or right facing L-shaped sofa, or comfortable U-shaped sectional couch. The versatile modular couch allows you to customize the layout to fit your space and lifestyle. The simple solid color design makes this sofa to easily blend into different decoration style and occasions, whether it's the living room, bedroom, office and children's play areas
  • Easy Assembly and Disassembly: This 148.8'' U-shaped sofa will be delivered in 2 boxes and easily carried. Before assembly, please check all parts. You can complete the installation in 30 minutes by following the included detailed instructions. The modular cloud couch is also easy to disassemblec and carry if you would move to a new place. Note: The cushions and pillows are vacuum-packed. After unpacking, please fluff them thoroughly, it may take 48-72 hours for fully expand
  • Stable Structure and Reliable Customer Service: The frames (armrests, backrests, seat frames) of sectional couches are made of wood, making them more stable, durable, andand load-bearing capacity is stronger than other products. Secure screw-on connections keep each part firmly in place, ensuring stability while making them suitable for a variety of body types. If you are not satisfied with the sofa you received, please feel free to contact our customer service team

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Seat Depth : 28.7 inches
  • Weight Limit : 1500 Pounds
  • Product Dimensions : 55.5"D x 143"W x 33"H
  • Item Weight : 113.8 Pounds
  • Leg Length : 3.15 Inches
  • Type : Sectional
  • Color : Dark Grey
  • Special Feature : Cloud Sectional
  • Seating Capacity 6.00 : Style Modern
  • : Seating Capacity 6.00
  • : Style Modern
  • Shape Rectangular : Frame Material Wood
  • : Shape Rectangular
  • : Frame Material Wood
View full details