Skip to product information
1 of 8

Vesgantti 74" Loveseat Sofa for Living Room, Comfy Cloud Couch Deep Seat Corduroy Modern 2 Seater Small Sofa with Armrest Pillow, Easy Assembly for Small Spaces, Beige

Vesgantti 74" Loveseat Sofa for Living Room, Comfy Cloud Couch Deep Seat Corduroy Modern 2 Seater Small Sofa with Armrest Pillow, Easy Assembly for Small Spaces, Beige

Regular price $826.19 USD
Regular price Sale price $826.19 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth—significantly deeper than others. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Twoadjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: The overall size of this loveseat modular sofa is 30"D x 74"W x 35.5"H, perfect on its own or in combination with Vesgantti modular sofas! You can customize your seating arrangement to suit your space and lifestyle. Its rearrangeable components make it effortless to refresh the look of your living room. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this modular couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This sectional couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This loveseat couch will be delivered in 2 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Weight Limit : 500 Pounds
  • Product Dimensions : 30"D x 74"W x 35.5"H
  • Item Weight : 88 Pounds
  • Type : Loveseat
  • Color : Corduroy - Beige
  • Special Feature : Cloud Sectional, Extra-deep Ottoman, Pillow Top Armrest, Removable Cover, Two Sets of Legs
  • Room Type : Bedroom, Living Room
  • Arm Style : Pillow-Top
  • Seating Capacity 2.0 : Style Modern
  • : Seating Capacity 2.0
  • : Style Modern
  • Shape Rectangular : Frame Material Wood
  • : Shape Rectangular
  • : Frame Material Wood
View full details