1
/
of
7
Novilla Twin Mattress, 10 Inch Hybrid Mattress in a Box, Gel Inflation Memory Foam with Pocket Coils Innerspring for a Cozy Night, Pillow Top Twin Size Mattresses, Medium Firm & Fit The Body's Curves
Novilla Twin Mattress, 10 Inch Hybrid Mattress in a Box, Gel Inflation Memory Foam with Pocket Coils Innerspring for a Cozy Night, Pillow Top Twin Size Mattresses, Medium Firm & Fit The Body's Curves
Regular price
$248.02 USD
Regular price
Sale price
$248.02 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- 3-ZONED ERGONOMIC DESIGN IDEAL FOR ANY SLEEPING POSITION - The Novilla twin size hybrid mattress is designed with three-zone precision support technology for all sleeping positions, effectively easing points of pressure and enhanced support from the head to toe, assisting with your spinal alignment. Whether you are a back, side, or stomach sleeper, you can experience the proper tension-free alignment with this 10-inch hybrid mattress.
- KEEP ING and BALANCED SUPPORT - Our 10-inch spring mattress utilizes a 3-layer foam design, including gel memory foam and supportive foam. It features soothing and effective weight-bearing support, is sturdy and durable, and absorbs moisture. This twin hybrid mattress conforms to the human curve, providing comfort and softness while improving blood circulation to relax the entire body as you enjoy sleep.
- MOTION ISOLATION FOR UNDISTURBED SLEEPING - The Novilla 10 inch twin mattress features an individual pocket coils spring system features a silent design that effectively reduces tossing and turning, allowing you to enjoy a peaceful and comfortable sleep condition. It balances your body weight, keeps spinal health, and relieves pains. This twin size mattress always gives you a quieter and deeper sleep experience.
- SUITABLE FOR MOST BASES AND FRAMES - The 10" twin-size pillow top hybrid mattress measures 75" L x 39" W x 10" H, which is compatible with most bed frames, you can even place the mattress on the floor directly without a frame. Unbox the mattress and let it inflate for about 72 hours for full expansion.
- HYBRID MATTRESS WITH MEDIUM FIRMNESS - Novilla spring mattress queen is medium firm touching with a 100-night sleep trial. Should you encounter any issues, please contact our customer support team at any time.
Overview
- Brand : Novilla
- Size : Twin
- Product Dimensions : 75"L x 39"W x 10"Th
- Top Style : Pillow Top
- Cover Material : Polyester
- Number of Layers : 4
- Fill Material : Foam, Gel Memory Foam, High Density Foam
- Special Feature : Low Motion Transfer, Pressure Relief, Temperature Regulating
- Color : White&green
- Coil Type : Pocketed Coil
- Item Weight 37.7 Pounds : Item Firmness Description Medium Firm
- : Item Weight 37.7 Pounds
- : Item Firmness Description Medium Firm
